The efficient execution of an industrial construction project relies heavily on early-stage planning to seamlessly transition jurisdictional control of a system from construction through CQV and into operations. This strategic planning, a continuous effort throughout the project's lifecycle, is best formalized through the creation of a Construction Turnover Plan (CTP) and meticulous management of Turnover Packages (TOPs). The Owner's TOP Manager assumes responsibility for overseeing and completing both the CTPs and TOPs.
Victor Torres is a journalist for Bioprocess Online, specializing in a wide range of topics including politics, sports, lifestyle, and current events. With a keen interest in international affairs, Victor brings a unique perspective to his articles, providing insightful analysis and engaging storytelling.